Brief Description: Work on map box, POH tray & tunnel pocket
29-06: Match-drilled holes in one of the Map Box hinges using a map box half as template. Drilled a #40 hole in the Map Box Door and marked places for the hinge holes. Deburred the map box parts.
43-04: Separated the angled piece from the F-12175 POH Tray and deburred the edges of both pieces. Also deburrd the F-12176 Tunnel Pocket and the F-12177 Pocket Base. There are existing holes in the Panel Base for the POH Tray and I did not have to drill new holes.
42C-17: Final-drilled four #19 holes in the F-1201Z Retaining Plate for the GPS-250 and then dimpled the holes per the plans.