Brief Description: Fuse Side Skins prep and Longeron match-drilling
Riveted the Arm Rests to the Fuselage Frame. Cut out the spar penetration holes in both F-1270 Fuselage Side Skins and deburred the edges of the holes. Riveted the F-1202 Gussets to the F-1202E Bulkhead Side Channels. Match-drilled holes into the top of the Longerons. Clecoed the skins to the fuselage skeleton and match-drilled holes into the sides of the Longerons. I had to disassemble the skins and longerons from the fuse frame a few times to shape the longeron so its vertex will align with the upper edge of the fuselage skins.