KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  2-25-2011
Number of Hours:  9.00
Manual Reference:  23-05 & -06
Brief Description:  Fuse Side Skins prep and Longeron match-drilling

Riveted the Arm Rests to the Fuselage Frame. Cut out the spar penetration holes in both F-1270 Fuselage Side Skins and deburred the edges of the holes. Riveted the F-1202 Gussets to the F-1202E Bulkhead Side Channels. Match-drilled holes into the top of the Longerons. Clecoed the skins to the fuselage skeleton and match-drilled holes into the sides of the Longerons. I had to disassemble the skins and longerons from the fuse frame a few times to shape the longeron so its vertex will align with the upper edge of the fuselage skins.
' style=

Arm Rests riveted.

Arm Rests riveted.

' style=

Match-drilling Longeron

Match-drilling Longeron

' style=

Fuse Skin clecoed to Longeron

Fuse Skin clecoed to Longeron

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.