Brief Description: Match-drilled Longerons and worked on other parts
Match-drilled #30 holes in the F-1225 L & R Longerons through the F-1234 Canopy Decks. Countersunk holes in the F-1205B Roll Bar Attach Plates and riveted nutplates. Deburred the Canopy Decks, the F-1205A Mid Fuse Brace and F-1205C Mid-Fuse Brace Close-out. Primed the above parts except for the Longerons. Riveted the Mid Fuse Brace to the aft side of the F-1204B Aft Bulkhead sides and then riveted the Roll Bar Attach Plates and Mid Fuse Brace Close-out to the Mid Fuse Brace and Bulkhead.