KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  2-15-2011
Number of Hours:  1.50
Manual Reference:  23-02
Brief Description:  More work on the Right Longeron

Bought a heavier soft-faced hammer from Home Depot and opened the fwd end of the aluminum angle. I then bent it (by hammering) to match the template. I removed a small piece from the aft end (optional step). Did some deburring of the piece. The longeron work has not been easy. I still need to do fine tuning work on the 2 longerons.
' style=

Right Longeron bent to shape

Right Longeron bent to shape

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.