KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  6-8-2010
Number of Hours:  2.00
Manual Reference:  18-02
Brief Description:  Fabricated the right Actuation Bracket

Fabricated the A-1207-R Actuation Bracket. It is supposed to be the opposite of the left side but there is no photo in the plans. I hope I did it right. As usual, this was a slow, tedious process.
' style=

Right Actuation Bracket

Right Actuation Bracket

' style=

R & L Actuation Brackets

R & L Actuation Brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.