Brief Description: Attach Angles ready for riveting.
Drilled and tapped the other AEX Tie Down (on W1206-L). Again, a very slow process. Clecoed the Attach Angles to the Spar Assemblies. I don't think I'll prime the Spar Assemblies. They're just too long and have many parts that were already assembled in the factory. If would be really difficult to prep them for priming if I had to do it.