KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  9-14-2009
Number of Hours:  2.00
Manual Reference:  10-04
Brief Description:  Work on Bulkhead Assembly.

Continued Bulkhead Assembly work. Drilled out and replaced a badly set AN470AD4-6 rivet. Installed 8 K-1000-3 nutplates on the front of the assembly and 3 AN426AD4-4 rivets at the top. Again used the pneumatic squeezer with good results and less effort.
' style=

Nutplates installed.

Nutplates installed.

' style=

Flush rivets holding nutplates.

Flush rivets holding nutplates.

' style=

Aft side of assembly.

Aft side of assembly.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.