KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  9-4-2009
Number of Hours:  2.00
Manual Reference:  10-02
Brief Description:  Fuselage Frames Assembly

Assembled the parts that were primed yesterday. First, the plastic F-1208A Wear Plate was riveted to the F-1208-R Frame and then the Right Frame was riveted to the Left Frame. The F-1209 Left and Right Frames were also riveted together.

Match drilled holes into the F-1210C Angle and final drilled # 12 holes in the F-1210B Plate, and deburred the holes. Joined the F-1210A Left and Right Fuselage Frames and riveted the Plate and Angle to the Frames.
' style=

Riveted Frames.

Riveted Frames.

' style=

Close-up of riveted Plate & Angle.

Close-up of riveted Plate & Angle.

' style=

Other side of riveted Plate.

Other side of riveted Plate.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.