KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  7-4-2012
Number of Hours:  6.00
Manual Reference:  12-07
Brief Description:  Work on Tailcone Fairings

Did more sanding and filing of the edges of the Upper and Lower Tailcone Fairings. Match-drilled holes from the F-1294C Tabs into the Fairings. Final-drilled #27 the middle holes in the tabs and the Upper Fairing. Machine countersinked the nutplate attach holes in the Tabs and then riveted K1000-06 nutplates. Over countersinked 2 holes in the Tabs and used Oops rivets after enlarging the corresponding holes in the nutplates with a #30 bit.
' style=

Fairings clamped to Tailcone

Fairings clamped to Tailcone

' style=

Holes match-drilled in fairings

Holes match-drilled in fairings

' style=

Tabs with nutplates riveted

Tabs with nutplates riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.