KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  7-1-2012
Number of Hours:  3.00
Manual Reference:  12-04-12-06
Brief Description:  Worked on the Tailcone Fairings.

Went back to Section 12 to work on the empennage fairings. Installed the V-Stab Assembly to the Tailcone. Made the masking tape templates to be used to match-drill holes in the farings and Tailcone, and to correctly position the fairings. Taped the templates to the Tailcone. Drilled holes in the Upper ((F-1294A) and Lower (F-1294B) Tailcone Fairings per the plans and then trimmed the excess material near the scribe lines. I used a rotary tool which worked very well. I'm stopping at this time because is has become too hot in the hangar. Outside temperature is over 100 degrees and I don't have AC in the hangar.
' style=

Tape template on Tailcone aft

Tape template on Tailcone aft

' style=

Trimmed Upper TC Fairing

Trimmed Upper TC Fairing

' style=

Trimmed Lower TC Fairing

Trimmed Lower TC Fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.