Brief Description: Worked on the Tailcone Fairings.
Went back to Section 12 to work on the empennage fairings. Installed the V-Stab Assembly to the Tailcone. Made the masking tape templates to be used to match-drill holes in the farings and Tailcone, and to correctly position the fairings. Taped the templates to the Tailcone. Drilled holes in the Upper ((F-1294A) and Lower (F-1294B) Tailcone Fairings per the plans and then trimmed the excess material near the scribe lines. I used a rotary tool which worked very well. I'm stopping at this time because is has become too hot in the hangar. Outside temperature is over 100 degrees and I don't have AC in the hangar.