KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  5-28-2012
Number of Hours:  5.00
Manual Reference:  30-03
Brief Description:  Worked on spar opening, cart assembly, shop organi

Bought and assembled a tool cart to be more efficient and organized in locating tools and parts (2 hours). Rearranged the location of the tool drawers and shelving units; unpacked parts and tools and put on shelves; and vacuumed the hangar floor of beetles which infest the building at this time of the year (2 hours). Filed the wing spar openings in the fuselage for easier placement of the wings. Rounded the areas where the rivet heads in the spars protrude and contact the fuselage skin. Also straightened the areas around the spar opening that were dented during wing placement and removal (1 hour).
' style=

Tool cart assembly

Tool cart assembly

' style=

Enlarged wing spar hole

Enlarged wing spar hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.