KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-22-2012
Number of Hours:  24.00
Manual Reference:  
Brief Description:  Assembled workbench, unpacked tools and parts

I've been busy the past few weeks with my move to SC. Went to the hangar today and reassembled my workbench. I had made it narrower and shorter before the move and now it measures 30 X 62 inches. I also assembled a steel shelving unit. Unpacked tools, aircraft parts and tools and arranged them. Still have to do a lot in the hangar - unpack, locate tools and parts, etc - to get to do work more efficiently.
' style=

Reassembled workbench

Reassembled workbench

' style=

Parts and tools unpacked

Parts and tools unpacked

' style=

Parts put on shelves

Parts put on shelves

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.