KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  7-28-2018
Number of Hours:  5.00
Manual Reference:  46, N18-04-06
Brief Description:  Silent Hektik Voltage Regulator Upgrade

Sanded the cowl opening and the NACA scoop per the plans. Applied fresh epoxy on the scratch marks on the fiberglass. Filled the #40 holes with flox epoxy mixture. Uploaded the Silent Hektik settings software to Skyview. Connected the WH-P3068 terminal to the negative battery terminal. Started the engine and things looked OK. Will need to fly the plane to verify proper functioning of the voltage regulator. Secured loose wires with tie wraps and lacing tape. Covered the firewall penetration holes with firewall sealant. Re-installed the upper forward fuselage skin and the canopy.
' style=

NACA scoop under top cowl

NACA scoop under top cowl

' style=

NACA opening and scoop

NACA opening and scoop

' style=

P3068 wire to battery

P3068 wire to battery

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.