Brief Description: Nose Fork Upgrade and wheel fairings installation
Worked on the Nose Fork Upgrade and Wheel Fairings installation. Installed AN5-11A bolts to the WD-01230-1 Nose Fork and torqued to 140 in-lbs. Separated the U-00006E-R-1 Fairing Bracket Mounts, deburred the edges, countersunk the nutplate rivet attach holes and primed the parts. Deburred the U-00002 Wheel Fairing Brackets, countersunk the nutplate rived attached holes and primed the pieces. Deburred the U-00006D-1 Wheel Fairing Brackets.