Continued Bulkhead Assembly work. Drilled out and replaced a badly set AN470AD4-6 rivet. Installed 8 K-1000-3 nutplates on the front of the assembly and 3 AN426AD4-4 rivets at the top. Again used the pneumatic squeezer with good results and less effort.