Prepared canopy handle and door handle assembly. Drilled and riveted handle plates. Prepared handle lever. Install door handle nutplates.Drilled handle and gear assemblly into left door. Installed foward and aft left door pin blocks. These will later be replaced with Planearound Third Latch pin blocks.