KitLog pro

Powered By Kitlog Pro v2.0

Matt's RV-10 Website
' style=
Date:  4-10-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Varous Wiring Tasks

1. ELT riveted and install on plane.
2. Fabricated ELY antenna cable and ran with trim wire.
3. Bleed brakes to test for leaks - looks good.
4. Remove mounted firewall componets in preparation for riveting upper foward fuse.
5. Ground wire ran for left defrost fan, ACM, and boost pump.
6. Pull cables for sides through subpanel adel clamps.
7. Fabricated transponder anteena cable.
8. Ran flap postion senors wires to ACM.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.