KitLog pro

Powered By Kitlog Pro v2.0

Matt's RV-10 Website
' style=
Date:  8-30-2015
Number of Hours:  4.00
Manual Reference:  FF1-2
Brief Description:  Overhead Console Install, Rivet Oil Cooler

Sanded micro/epoxy from yesterday. Sanded cabin top and overhead console in preparation for bonding. Cut out areas in overhead console to allow to gas strut hinges. Drill and install coat hanger rack on overhead console. Bonded overhead console to cabin top. Fabricated tool I found on Matronics fourm used to install vents on overhead console later. My wife helped me rivet oil cooler box to firewall and placed firewall sealant. Before bed and added some micro/epoxy to area cabin top to begin to make transition between it and overhead console.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.