KitLog pro

Powered By Kitlog Pro v2.0

Edward's RV-7 Site
' style=
Date:  12-1-2013
Number of Hours:  6.11
Manual Reference:  6-4, 6-5
Brief Description:  Drilling the Vertical Stabilizer

Started on 11-30.
Clecoed ribs to front and rear spars.
Final drilled #30 VS-808PP, VS-410PP, VS-411PP and VS-412PP to VS-803PP.
Drilled all rib to spar attach holes to #30.
Clecoed on the VS-801PP skin.
Drilled and match drilled all holes attaching the VS-801PP skin.
' style=

VS skeleton

VS skeleton

' style=

Preparing to drill/match drill

Preparing to drill/match drill

' style=

VS Match drilled and disassembled

VS Match drilled and disassembled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.