Brief Description: Drilling the Vertical Stabilizer
Started on 11-30. Clecoed ribs to front and rear spars. Final drilled #30 VS-808PP, VS-410PP, VS-411PP and VS-412PP to VS-803PP. Drilled all rib to spar attach holes to #30. Clecoed on the VS-801PP skin. Drilled and match drilled all holes attaching the VS-801PP skin.