Powered By Kitlog Pro v2.0
Edward's RV-7 Site
RV-7
All
11-29-2013
< Previous Log Entry
Next Log Entry >
Date:
11-29-2013
Number of Hours:
4.32
Manual Reference:
6-4
Brief Description:
Drilling the Vertical Stabilizer
Clecoed VS-808PP spar doubler to VS-803PP rear spar. Clecoed on the hinge brackets VS-410PP, VS-411PP and VS-412PP. Back-drilled VS-410PP hinge bracket.
VS ribs edge-finished and fluted
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
41
110
Empennage
41
110
Copyright © 2001-2024 Matronics. All Rights Reserved.