KitLog pro

Powered By Kitlog Pro v2.0

My earth journey takes flight
' style=
Date:  10-15-2015
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Cowling - Cooling Inlet Construction

Made the join line flange. The upper cowl fits in under the inlet holes. Should just need one mounting screw on the inside near the spinner. The join came out pretty good but will need a little bit of filling to get it smotthly lined up. Even though it was one piece as soon as it is cut both sides take on their own special shapes.

Augmentor outlet attached to lower cowl. Oil cooler outlet duct cut out. I will be putting a door here so that oil cooler flow can be regulated.
' style=

Join flange

Join flange

' style=

Fits together pretty well.

Fits together pretty well.

' style=

Oil cooler outlet duct cut ou

Oil cooler outlet duct cut ou

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.