KitLog pro

Powered By Kitlog Pro v2.0

Mikes Web Site
' style=
Date:  11-18-2016
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Hanger taxiway

It was a cold and rainy day, but an excellent opportunity to check for leaks. I was happy to see only the water that had blown in throught the gaps in the doors. I will eventually work on sealing those gaps. The little airport has only 14 hangers total so traffic shouldn't be to terrible :-) The paved, 60 foot wide x 4200 foot long runway should be plenty for the Savannah...
' style=

open hanger

open hanger

' style=

hanger taxiway

hanger taxiway

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.