A lot of small jobs were done today. The final screws were put into the Canopy structure, replacing the temporary screws. The Flap Hinge pin was modified such that it can be easily removed without removing the wings. The pin was split in two and inserted from the middle of the flap instead of at the end. The centers were safety tied to secure it. All remaining rivets in the wings were installed. The rudder hinge was cut to final size and installed and secured with cotter pins. The old style trim tap was removed and the holes were filled CCP-42 rivets.