Today was spent cleaning the hanger after last weekends excitement (i.e. engine start). Two additional items were completed. An teflon insulator was added between the temperature probe and the oil cooler baffles. This was causing a error in the the Oil Temp readings on the Grand Rapids EIS. Also the final Tie Down point was added to the left wing.