KitLog pro

Powered By Kitlog Pro v2.0

Michael's Sonex Project
' style=
Date:  9-6-2008
Number of Hours:  3.00
Manual Reference:  Misc
Brief Description:  Cleaning

Today was spent cleaning the hanger after last weekends excitement (i.e. engine start). Two additional items were completed. An teflon insulator was added between the temperature probe and the oil cooler baffles. This was causing a error in the the Oil Temp readings on the Grand Rapids EIS. Also the final Tie Down point was added to the left wing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.