Date:  8-9-2008
Number of Hours:  5.00
Manual Reference:  Misc
Brief Description:  Pitot Static/Panel/Wiring

The Pitot/Static system was connected. This included connecting to the BMA EFIS system and then connecting to the run from the wings. Finally the pitot tube (with static tube) was re-installed on the wing. The two OAT probes were installed into the two side NACA vents. The panel was then re-installed. The wiring going to the rear was cleaned up and cable tied.
' style=

Panel Installed

Panel Installed

' style=

Fuse Blocks w/ Labels

Fuse Blocks w/ Labels

' style=

Pitot/Static Installation

Pitot/Static Installation