The Pitot/Static system was connected. This included connecting to the BMA EFIS system and then connecting to the run from the wings. Finally the pitot tube (with static tube) was re-installed on the wing. The two OAT probes were installed into the two side NACA vents. The panel was then re-installed. The wiring going to the rear was cleaned up and cable tied.