KitLog pro

Powered By Kitlog Pro v2.0

Michael's Sonex Project
' style=
Date:  5-24-2008
Number of Hours:  5.00
Manual Reference:  Misc
Brief Description:  Various Panel Wiring Jobs

Connected the stick grip wiring for the PTT and EFIS Display change. This included using smalll quick disconnect connectors. The OAT probe for the EFIS was connected to the DB25 connector. The fuel level sensor control module was mounted in the cockpit area and wired toe the EIS system. The Pitot and Statid main lines behind the panel were run. Reduction tubing and adapters will be needed to connet to the EFIS.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.