KitLog pro

Powered By Kitlog Pro v2.0

Michael's Sonex Project
' style=
Date:  11-24-2007
Number of Hours:  3.00
Manual Reference:  SNX-D01
Brief Description:  Canopy Frame Work

The alignment of the front canopy bow was again checked and found to be correct. The hole through the Front and Aft canopy bows through the welded angles were drilled. The horizontal support on the aft bow was permanently attached with rivets after deburring. The alignment pin was located, drilled, tapped and installed. During the alignment pin installation the alignment hole was drilled.
' style=

Alignment Pin Installed

Alignment Pin Installed

' style=

Alignment Hole Drilled

Alignment Hole Drilled

' style=

Aft Canopy Bow

Aft Canopy Bow

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.