The top aft skin was removed and the holes were deburred. The skin was then primed along the rib lines with Zinc Oxide. The holes for the top aft skin in the ribs were then deburred and then primed. The hole for the pitot tube assembly was located in the leading edge skin and punched with a 1 3/4" hole punch.