KitLog pro

Powered By Kitlog Pro v2.0

Brents Panther Project
' style=
Date:  12-19-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  ENIGINE BUILD CORVAIR

Installed pistion/ring assembly into cylinders, Then installed rod bearings on connecting rods and installed cylinder assembly to crank using oil/stp mixer on rod bearings and ARP lube on rod bolts torque to 28 ft-lbs.
Next install oil filter housing using prematex ultra black RTV on gasket (light coat) torue bolts to 14 ft-lbs.

Next installed hybrid studs with 620 Loctite torque to 25 ft-lbs.
Next installed safety shaft, marked safety shaft to be sure I had full thread engagement on safety shaft before appling 620 Loctite. Then appiled 620 Loctite a screwed shaft into 5th bearing using mark as a ref and let 620 Loctite dry over night.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.