KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  8-3-2007
Number of Hours:  2.00
Manual Reference:  sht 602
Brief Description:  prep aft stab spar for finish

I lost some sleep over this decision but thought it to be the right move. Since the elevator hinges and other attachments to the stab spar are called for permenent mounting at this time - I decided to lay on some finish ( paint ) prior to this happening. The area will be difficult to properly finish with the fixtures in place and the area is also small .

Applied two coats of dupont urethane white primer , wet sand w/400
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.