KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
Work Logs Found: 44
Category Work Time: 158 Hours
 Date
Hours
Work Log Summary

Details

 05-20-2009
8.00
main door interferance
Details
       

 04-23-2009
0.00
Hydruilic position indicator sheme overview 2
Details
       

 02-25-2009
4.00
303-4 hyd hoses
Details
       

 02-24-2009
5.00
tubes , wheels and brakes
Details

 02-13-2009
8.00
hydrulic lines wheel well
Details
       

 02-11-2009
3.00
hydrulic lines
Details

 02-10-2009
3.00
hydrulic lines
Details
     

 02-07-2009
1.00
over center spring
Details
     

 01-31-2009
4.00
final install main langing gear
Details
       

 01-30-2009
4.00
side brace pivot
Details
       

 01-29-2009
2.00
make plates for pivot washers
Details
       

 01-11-2009
6.00
install mains on center section
Details

 01-10-2009
6.00
assemble main landing gear
Details

 01-08-2009
2.00
clean assemble lower leg
Details
       

 01-07-2009
3.00
gear prep for assembly
Details
       

 01-06-2009
3.00
clean up main gear
Details

 01-05-2009
8.00
prep and paint
Details

 01-03-2009
4.00
powder coating
Details

 01-02-2009
4.00
powder coat main gear
Details
     

 01-01-2009
3.00
Prep for powder coat
Details

 12-30-2008
1.00
grease zerts
Details
       

 12-30-2008
3.00
Dissasemble for paint
Details
       

 10-08-2008
5.00
secondary door hard points
Details
       

 08-29-2008
2.00
secondary gear door hydrulic cylinder
Details

 06-10-2008
3.00
seting side stay brackets
Details
       

 06-10-2008
20.00
locate fit fabricate
Details
       

 06-10-2008
2.00
landing gear stops Mains
Details
       

 06-10-2008
0.00
landing gear notes
Details
       

 06-10-2008
0.00
hardware issues landing gear
Details
       

 05-18-2008
2.00
finish out LG Brackets
Details
       

 05-15-2008
3.00
Main over center link
Details
     

 05-12-2008
2.00
landing gear mounts
Details
       

 05-11-2008
2.00
assemble gear
Details
       

 06-01-2007
0.00
update
Details

 05-18-2007
3.00
finish brace - jiged for tig
Details
       

 05-09-2007
2.00
Press fork to lower leg
Details
       

 05-08-2007
1.00
prep fork for press fit
Details
       

 05-06-2007
5.00
steering antler
Details
       

 04-25-2007
1.50
Brace assembly
Details
       

 04-18-2007
2.00
fabricat Brace assembly
Details
     

 04-17-2007
4.00
Nose gear assembly
Details
     

 04-14-2007
6.00
MLG
Details
       

 04-08-2007
6.00
Main Landing Gear
Details

 04-07-2007
2.00
main landing gear fabrication
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.