KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  6-1-2007
Number of Hours:  2.00
Manual Reference:  Ribs 1-9
Brief Description:  Rib construction

Wood finaly arrived !! Took inventory / seperated stock to plan sheets.

Cut and loaded first master rib . Need to scale and cut first master set of Gussets from 1.5 mm ply.


Concerns - I have reservations about pulling the ribs from the jig ! All the info I've found on rib jigs is about the same type set up. Im not concerend about the epoxy adhering the rib to the jig. I just dont think its going to slip right out of that jig without some finess.

Bigger concern - my wifes going to be looking for her waxpaper and sandwich wrap !
' style=

gusset tracing on ply

gusset tracing on ply

' style=

gusset material

gusset material

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.