I started the day by match drilling and deburring the holes in the left elevator leading edge. I used my blind rivet hand tool to install the AD-41-ABS blind rivets as called for on DWG 5 drawing. I paid close attention to make sure both skins were tight against each other before I set the rivet. I set the left elevator aside and started the right elevator leading edge rolling as I had done on the left.