KitLog pro

Powered By Kitlog Pro v2.0

MARK'S WEB SITE
' style=
Date:  9-7-2011
Number of Hours:  4.50
Manual Reference:  Section 6-13
Brief Description:  Blind Rivet Leading Edge

I started the day by match drilling and deburring the holes in the left elevator leading edge. I used my blind rivet hand tool to install the AD-41-ABS blind rivets as called for on DWG 5 drawing. I paid close attention to make sure both skins were tight against each other before I set the rivet.
I set the left elevator aside and started the right elevator leading edge rolling as I had done on the left.
' style=

Blind Rivets Installed

Blind Rivets Installed

' style=

Blind Rivets Installed

Blind Rivets Installed

' style=

Leading Edge Done

Leading Edge Done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.