Powered By Kitlog Pro v2.0
LANCE'S WEB SITE
CH650
Empennage
11-29-2017
< Previous Log Entry
Next Log Entry >
Date:
11-29-2017
Number of Hours:
1.00
Manual Reference:
6T2-1,2,3,6
Brief Description:
Final up-drilling to open up some of the holes to
Drilled out 6T1-1 end pieces to A4 size (was at A3).
Drilled out rib ends to A5 (was A4).
Drilled out 6T2-1, 6T2-2, 6T2-3, 6T2-6 holes to A5.
A3 = silver cleco (#40 drill bit)
A4 = gold cleco (#30 drill bit)
A5 = black cleco (#20 drill bit)
Yes, I checked for burrs and took appropriate action.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH650 Home
Category
# Logs
# Hours
All
220
591
Empennage
40
103
Engine
2
10
Fuel System
8
20
Fuselage
1
Inspection
1
1
Shop Supplies
3
7
Tools
3
8
Wings
162
442
Copyright © 2001-2024 Matronics. All Rights Reserved.