Builder Name: Lance Miller - Project: Zenair - CH 650 B - VIEW REPORTS Total Hours: 428.3 Total Flight Time: Start/Last Date: Dec 10, 2015 - No Finish Date Engine: Corvair
Sep 04, 2022 Right Wing final rivet rear ribs (main and rear spar) - (2 hours) View the photos for this entry in a carousel format Category: Wings Final riveted rear ribs, both front and rear spar. Torqued AN3 (20 in.lb. to 25 in.lb + 12-15 in.lb. friction/drag torque = 34 in.lbs.) and AN4 (50 in.lbs to 70 in.lbs. + 12-15 in.lbs = 64 in.lbs.) bolts on main spar plate and applied torque marker.
Sep 03, 2022 Rt Wing rear spar hand rivet all but ribs - (1.5 hours) View the photos for this entry in a carousel format Category: Wings Rt Wing rear spar hand rivet all but ribs. Drilled wiring gromet holes and cleaned them up for nylon/plastic gromets. Top hole is for landing and taxi lights...bottom hole is for nav lights. I accidently overdrilled (with step drill) the nav light hole on rib for bell crank. It still fit a rubber gromet perfectly, and after popping that sucker in, I was able to put the nylon/plastic one in like a perfect fit.