Made doublers to go under the wing locker door supports to add stiffness and to space the Dzus fastener springs further away for more tension. Finished installing the right wing locker door. Required enlarging the Dzus fastener holes in the support strips so the Dzus fastener spring clips wouldn't catch on the holes and prevent the Dzus fastener from coming loose.