KitLog pro

Powered By Kitlog Pro v2.0

Louies Web Site
' style=
Date:  1-28-2010
Number of Hours:  7.00
Manual Reference:  6-ZU-1
Brief Description:  Nose rib install

Finished applying zinc chromate to the nose ribs, spar doubler, and angle brackets for the left wing nose ribs. Riveted and bolted them in position according to the drawing 6-ZU-1. De-burred rivet holes drilled between existing rivets on top and bottom of the spar. Extra rivets required by SAIB Upgrade on drawing 6-ZU-4. Set the rivets on the bottom of the spar. Riveted nose ribs to the bottom of the leading edge skin.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.