Date:  8-3-2009
Number of Hours:  36.70
Manual Reference:  M3X-55-30-10-0000
Brief Description:  Vertical Stabilizer Construction

8-3-2009 1915-1930 (.25 hours)
Cutting plywood to accomodate dropping in the boom tube receptical.

8-4-2009 1800-2030 (2.50 hours)
Laid out blocks and marked out jig for V-Stab. Started cutting tubing.

8-5-2009 1845-2000 (1.25 hours)
More tube cutting.

8-8-2009 1000-1030 (.5 hours)
AFTER CONSULTING WITH FACTORY ANOTHER ERROR ON DIMENSIONS WAS FOUND. M3X-55-30-10-0000 IS DEMENSIONED INCORRECTLY. BOTH TUBES THAT CONNECT UPPER PORTION OF V-STAB TO STEEL BASE ARE WRONG.

8-29-2009 0930-1130 (2.00 hours)
Discarded incorrect length tubes and re-cut new ones to correct dimensions.

8-30-2009 0800-1030 (2.50 hours)
Fabricated gussets.

8-30-2009 1115-1445 (3.50 hours)
Installed gussets.

8-31-2009 0915-1215 (3.00 hours)
Completed gusset installation.

9-1-2009 1830-1930 (1.00 hours)
Fabricated internal supports.

9-3-2009 1750-1905 (1.25 hours)
Completed internal support fabrication.

9-4-2009 1800-1900 (1.00 hours)
Fabricated lower V-Stab tubes.

9-5-2009 0800-1415 (6.25 hours)
Fabricated lower V-Stab gussets.

9-6-2009 0800-1200 (4.00 hours)
Completed lower V stab assembly.

9-6-2009 1300-1530 (2.50 hours)
Completed initial assembly, started sanding and preparing for Alodyne..

9-7-2009 0815-1400 (5.45 hours)
Cleaned, Alumipreped (note 3 parts water to 1 part Alumiprep), and Alodyned.


Total hours this page =
' style=





' style=




' style=

Scotch Brite and a pool on a 95 degree day in FL..Ah life is good!