Brief Description: Vertical Stabilizer Construction
8-3-2009 1915-1930 (.25 hours) Cutting plywood to accomodate dropping in the boom tube receptical.
8-4-2009 1800-2030 (2.50 hours) Laid out blocks and marked out jig for V-Stab. Started cutting tubing.
8-5-2009 1845-2000 (1.25 hours) More tube cutting.
8-8-2009 1000-1030 (.5 hours) AFTER CONSULTING WITH FACTORY ANOTHER ERROR ON DIMENSIONS WAS FOUND. M3X-55-30-10-0000 IS DEMENSIONED INCORRECTLY. BOTH TUBES THAT CONNECT UPPER PORTION OF V-STAB TO STEEL BASE ARE WRONG.
8-29-2009 0930-1130 (2.00 hours) Discarded incorrect length tubes and re-cut new ones to correct dimensions.