KitLog pro

Powered By Kitlog Pro v2.0

Frans Web Site
' style=
Date:  7-11-2009
Number of Hours:  7.00
Manual Reference:  M3X-55-20-20-0000
Brief Description:  Elevator and H-Stabilizer Construction

8-1-2009 1400-1530 (1.50 hours)
Hinge drill jig fabrication

8-2-2009 0800-1230 (4.50 hours)
Fabricated Elevator-H-Stabilizer hinges.

8-3-2009 1830-1915 (.75 hours)
Fabricated Elevator-H-Stabilizer hinges.

8-8-2009 0945-1000 (.25 hours)
AFTER CONSULTING WITH KOLB FACTORY IT WAS DISCOVERED THAT AN ERROR IN DRAWING M3X-55-20-10-0000 MISLABELS THE LENGTH AT 49.12". THE CORRECT DIMENSION IS 50.00". TALKED WITH BRIAN AT KOLB, HE APPROVED TRIMMING THE OUTBOARD EDGE OF THE H-STAB TO MATCH ELEVATOR LENGTH OF 49.12" , IF YOU ARE BUILDING A KOLB AND READING THIS CHECK WITH THE FACTORY!
' style=

1 Completed Elevator

1 Completed Elevator

' style=

With 1 complete H-Stab

With 1 complete H-Stab

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.