Powered By Kitlog Pro v2.0
RV-7 Construction Log
RV-7
Fuselage
6-24-2021
< Previous Log Entry
Next Log Entry >
Date:
6-24-2021
Number of Hours:
2.00
Manual Reference:
Dwgs 27, 27A
Brief Description:
Vertical Stabilizer Attach
Trimmed the VS forward spar about 7/16”. The fit on the fuselage looks really good. This is REALLY starting to look like an airplane!
Also started fabrication of the F-712D up elevator stop/VS attach angle.
Drawing and stock to fabricate the F-712D
Rear spar fits to the aft bulkhead better now that the front spar has been trimmed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
170B Home
RV-7 Home
Category
# Logs
# Hours
All
722
1903
Empennage
117
275
Fuselage
365
966
Miscellaneous
10
7
Replacement Parts
1
7
Shop
1
Tools
8
4
Wings
220
644
Copyright © 2001-2024 Matronics. All Rights Reserved.