KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-12-2019
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Final Ironing of the Fuselage

Used the large iron set to 350 degrees to iron the fabric of the fuselage starting with the bottom of the airframe. Ironed the right side and found a couple of areas on the tapes which needed some additional glue. Applied the glue to those areas and also inspected the right side and top and applied glue to any areas that lack sufficient glue. Ironed the left side of the fuselage and then the top. Checked the fabric and found it tight over the fuselage.

Sprayed the bottom of the fuselage with the Steward Systems cleaner and wiped it down. When over the bottom with clean water on a rag wiping down the fabric getting it ready for the primer. Painting starts during the next work day.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.