Applied tapes over the vertical fuselage supports at stations F21 and F23 on both sides of the fuselage. Also taped the diagonals at F22 and F24 on both sides of the fuselage. Added a 3 inch tape down the center of the turtleback. Glued a 2 inch tape across the turtleback at the bottom of the shield. Ironed the front half of the fuselage with a 350 degree iron. Also ironed the turtleback all the way to the rudder post. The bottom and tail end half of the fuselage remains to be ironed during the next work day.