KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  4-11-2019
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Ironed the Bottom Fabric on the Fuselage

With Paul's help connected the second tail wheel chain to the cable from the rudder bar.

Completed the final gluing of the fabric over the tail wheel brace. Set the iron to about 250 deg. and started ironing the fabric from the front. Completed the ironing finishing at the tail wheel. Trimmed some excess fabric from the tail wheel area on the fuselage. Marked the fabric where the anti-collision light and vhf antenna are to be installed. Completed a second ironing at 300 deg.

Set up the label maker with black 1/2 inch tape. Created labels for the electric fuel pump and the emergency electric power switches. Will continue the labeling during the next work day.
' style=

Bottom Ironed Twice

Bottom Ironed Twice

' style=

Switch Labels

Switch Labels

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.