KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  10-19-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed Landing Gear Mount Bolts

Aligned the drill about one inch below the longeron of the fuselage centered on the landing gear leg and drilled a level 1/4 inch hole through the leg and the fuselage. Repeated the drilling for the remaining three legs of the landing gear. Inserted an AN4-17a bolt through each mounting point. Added a heavy duty tang and self locking nut to each bolt on the inside of the leg.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.