KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  10-9-2019
Number of Hours:  1.20
Manual Reference:  
Brief Description:  Applied Fabric Patches to Cable Opening

Cut fabric patches to fit over the opening near the cable opening on the top wing. Applied glue around the opening and then laid the patch down and applied a coat of glue over it. Applied six patches to cover the areas needing the support. Left the patches to dry in place. Went over each of the patches with the small iron after they had dried for more than an hour to set each in place.

Painting will occur during the following work days.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.