Checked and rerouted the aileron cables to provide the best clearance through the aircraft. Noted areas where shims may be required.
Started the fabrication of a bracket for the pulley to be used to route the crossover cable away from the stick control assembly. Did several testing fitting of the bracket with more work to do to arrive at a configuration that provides cable clearance.