Date:  12-8-2017
Number of Hours:  0.65
Manual Reference:  
Brief Description:  Designer Precovering Inspection

Robert Baslee from Airdrome Aeroplanes came by and conducted a inspection on the aircraft. During the walk around the following were noted;

- Control cables must be supported to keep them off any metal that is near their route.
- Corners of the ailerons and the aft wings must be braced to maintain shape.
- The wing tips need additional bracing to maintain shape under covering.
- The forward left bolt on the elevator requires a large washer to support the load.
- Consider placing wood blocks within the bracing bolts on the vertical stabalizer.
- Consider moving the outboard upright supports up next to the spars to ensure that the bolts are within 2 inches of the spar.