KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  8-4-2016
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Forming the Fuselage Maneuver Handle

Put a length of 1/2 inch steel tubing into the bender and positioned it for a 90 degree bend for 4 1/2 inches. Repositioned the tube 8 inches from the first bend and repeated another 90 degree bend on the same axis. Set the handle on the fuselage and marked the cutoff points. Used a chopped saw to remove the excess material from each leg. Set aside for later welding.
' style=

Maneuver Handle

Maneuver Handle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.