KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  6-12-2010
Number of Hours:  1.00
Manual Reference:  Chapter 3
Brief Description:  3rd Layup Preparation

The 1 inch foam block was removed from the base with a butcher knife and sanding block.

The edges from the second layup were sanded. The bottom glass surface was sanded dull.

A 1/4 inch flox corner was marked then the foam removed using a precision knife.

The tools, work table, and shop floor were cleaned and the base is ready for the 3rd and final layup of this practice piece.
' style=

Remove 1

Remove 1" foam block & sand

' style=

Mark 1/4

Mark 1/4" flox corner

' style=

Remove foam for flox corner

Remove foam for flox corner

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.