Brief Description: Fwd landing gear bulkhead forward face layup
The shop temperature was 90deg F with the humidity lowered to 40% by using the dehumidifier. I put masking tape on the tapered edge to avoid getting any epoxy or slurry on that edge. Micro was applied to the foam follwed by 2 plies of BID over the entire piece. 1 ply of UND was applied across the horizontal then the entire layup was covered with peel ply. Wax paper was placed over the peel ply followed by a sheet of wood with bricks to weigh down the layup while it cures.